Imperial parts Imperial ICVG FAN 115V W/16" LONG LEAD WIRES

ICVG FAN 115V W/16" LONG LEAD WIRES

ICVG FAN 115V W/16" LONG LEAD WIRES
Part no 296502
Manufacturer Imperial
Stock 15
 
$81.82
Quantity

Description

  • ICVG FAN 115V W/16" LONG LEAD WIRES
  • Fits on Models: IMPERIAL